TALISAY CITY, Cebu — A 100-meter drainage canal is being built near the Dumlog Baywalk as the barangay works to address flooding during periods of heavy rain. The project, which started on June 22, is expected to be completed within 50 days. Workers, however, have faced delays as rainwater accumulated in the construction area. Barangay